


Buildings
Restoration of the
copper crown on the pediment of the central projection of the Winter
Palace façade
In June 2005, a crown was once again installed on the pediment of the
main projection of the Winter Palace facade. The state entrance to the
palace complex thus reacquired the festive appearance it had during
the second half of the 19th - early 20th centuries.
full story
Reconstruction of
the Small Hermitage Power Supply Control Panel
The reconstruction of the power supply control panel is a logical continuation
of the multifaceted programme of technical modernization of engineering
networks and equipment in the State Hermitage that has been carried
out over the course of recent years.
full story
Inspection Work
on the Rafter Systems of the New Hermitage Building
In 2005 a four-year project of inspecting the rafter systems of the
New Hermitage building was completed. During the course of four years,
the Department of History and Restoration of Architectural Monuments
of the State Hermitage led by Valery Lukin, together with German engineers
and students, carried out a systematic inspection of metal rafter systems
in the New Hermitage building, which was constructed in 1842-45.
full story



